Friday, October 10th 2014–we’ve officially begun renovation of our production studio! Our contractors are terrific, they came in over the past few days to go over the final details, shift whatever barang (belongings) that I wanted moved to the shop downstairs (including our 85kg shrink wrapping machine and curing racks), and tidied away all the mess I left behind to be tossed out of the studio. It feels GREAT to clear out all the junk from the cupboards and shelves!
We opened up the emergency stairwell, found a good locksmith who replaced all the broken locks and swapped out padlocks.
On Saturday the wrecking crew came in to start removing the carpet tiles, vinyl flooring and the existing partitions. Can’t wait to see what the space looks like on Monday!